3. Sector : Civil Works
Cluster 02 C Under Amrut 2.0 1) Navsari WSS, 2) Navsari UGD, 3) Navsari Stp Scheme and 4) Augmentation Navsari WSS. Working Survey, Soil Investigation, Design & Construction, Testing & Commissioning of RCC Intake Structure with Approach Bridge, Conventional Water Treatment Plant, RCC Sump, ESR, Providing, Supplying, Lowering, Laying and Jointing MS/DI/PVC Pipeline Network, Providing, Supplying, Erecting and Testing of Pumping Machineries, Pumping Stations, Inlet Chamber. Flowmeter Chamber, RCC Road, Security Room, Compound Wall, Electrification Work, House Connection Work Etc. with Operation & Maintenance with All Allied Works for 5 [five] Years Including 3 [three] Years Defect Liability Period for Navsari-Vejalpore Nagarpalika Water Supply Project. Working Survey, Soil Investigation, Design of Underground Drainage Project, Work Including Providing, Supplying, Lowering Laying, Jointing, Testing & Commissioning of RCC Np3 Pipes for Sewer Collecting System - Gravity Mains and Di Pipes for Rising Main Pipeline, Construction of Sewage Pumping Station (SPS), Supplying, Erecting, Testing & Commissioning of Pumping Machineries, Construction of House Connections, Road Restoration, Providing and Supplying of Sewer Cleaning Equipments, Electrical Work Etc. with Operation & Maintenance with All Allied Works for 5 [five] Years Including 3 [Three] Years Defect Liability Period for Navsari Nagarpalika Underground Drainage Project. Working Survey, Soil Investigation, Design of Construction of STP 24 MLD. Work Including Soil Filling Work in Stp Plot Area, Design and Construction of Retaining Wall, Earth Work for Approach Road and Construction of Protection Wall for STP Plot Area Etc. with Operation & Maintenance with All Allied Works for 5 [Five] Years Including 3 [Three] Years Defect Liability Period for Navsari Nagarpalika 24 MLD STP. Augmentation Project at Navsari Nagarpalika (RAW Water Transmission Line and Intake Well with Approach Bridge, Including Chlorination Room, HT/LT Room, Toilet Block, Compound Wall, with Electromechanical and Instrumental Work at Purna River) with Operation & Maintenance with All Allied Works for 5 [Five] Years Including 3 [Three] Years Defect Liability Period for Augmentation Project.
|
Value :
252.57 Cr
*
|
2.52 Bn
*
|
Due Date :
1 Day to go
|
14/05/2024
|
TID :70494613
Gujarat
|
|
|
|
|
|
7. Sector : Water Storage and Supply
Design, Build & Operate for Augmentation of Kadana Part-1 (zone Abc) with Faliya Regional Water Supply Scheme. Carrying Out Level Survey, Soil Investigation, Detailed Survey Work, Designing Etc for Providing, Supplying, Lowering, Laying and Jointing M.s/d.i/pvc / Rising /gravity Pipeline, Designing and Constructing Intake Well of Bridge Over Canal , Rcc Hglr/ Ug Sump , Pump House, Staff Quarters, Constructing of Compound Wall and Approach Road, Installation, Testing & Commissioning of Pumping Machineries at Hw and Sub Hw of Aumenation of Kadana Part-1 (zone Abc) with Faliyaregional Water Supply Scheme Under Wss-8 Tribal Programmer of Aumenation of Kadana Part-1 (zone Abc) with Faliya Regional Water Supply Scheme Including Operation & Maintenance (for 120 Months)ta - Kadana/s’pur, Dist.-Mahisagar, Gujarat.
|
Value :
105.61 Cr
*
|
1.05 Bn
*
|
Due Date :
14 Days to go
|
27/05/2024
|
TID :70400280
Gujarat
|
|
|
|
|